Go to WWW Search through the site of AJEC
AJEC AJINOMOTO ENGINEERING CO.,LTD.
 
 
 
Registration of production planning
Registration of capacity utilization plan
Registration of personnel assignment plan
Production change of schedule
Various master registration
Production plans table
Capacity utilization plan table
Personnel assignment plan table
Master table
Production order finalization
Manufacturing process surveillance screen
Trend screen
Measurement instructions sheet
Manufacturing instructions sheet
Registration of measuring results
Registration of usage results of packaging materials
Registration of manufacturing results
Collection of production facility data
Registration of actual capacity utilization results
Measurement results table
Usage results of the packaging materials table
Manufacturing results table
Capacity utilization record table
Registration of acceptance inspection records
Registration of foreign substance test results
Registration of quality analysis
Registration of pre-shipment inspection results
Receiving inspection list
Materials package inspection record
Pre-shipment inspection list
Product inspection record
Raw materials history search
Product history search
Equipment history search
Process history search
Preservation plan creation
Equipment check management
Work check management
Preservation plan
Equipment maintenance record
Work preservation record
Utility surveillance
Scheduler
Licensed person management
Standard operation procedure
Electronic signature
Analysis report
* For the manufacturing control system, we can build a customized system with minimum configuration based on your needs.
Registration of receiving schedule
Registration of receiving results
Registration of returned goods receiving record
Report output
Closing receiving schedule
Correction of receiving results
Correction of returned-goods record
Receiving schedule list
Receiving results list
Receiving work list
Returned-goods receiving record list
Registration of delivery schedule
Registration of delivery results
Registration of returned goods delivery record
Temporary allocation
Delivery order
Allocation distribution
Finalizing batch planning
Closing delivery schedule
Correction of delivery results
Correction of returned-goods record
Organizing Batch
Cancellation of delivery order
Delivery adjustment
Report output
Delivery schedule list
Single order, picking list
Total picking list
Assortment by destination for total picking
Assortment by destination for single picking
Shipping list
Stock-out item list of temporary allocation
Delivery results list
Statement of delivery
Stock-out item list of allocation
Stock list �iby location)
Stock list (by lot and date)
Stock list (by product and product summary)
Stock list (by warehouse)
Inventory work list
Inventory check list
List of inventory variance (in order of item/location)

 

PAGE TOP
▮ HOME HOMESite MapAjinomoto Group Companies
Contact Us
E-mail:
Phone: +81-44-233-0294
▮ About AJEC About AJECOur MissionBusinesses Sectors
Quality and Environmental Policy
▮ Our Services Technologies and Services Construction Technology by Systematic Method
Construction ManagementProduct Information SystemsService Flow Chart
Our Environmental PolicyOur Projects
▮ News & Events ❘ information ❘
▮ Employment Information ❘ Employment Opportunities ❘
▮ Corporate Profile Corporate ProfileCorporate OrganizationOffices and Subsidiaries
Copyright(C)1999-2012 Ajinomoto Engineering Corporation All Rights Reserved.